
Czechia: D1 reopened, with a speed limit on around exit 370
The section of D1 motorway near Ostrava – Svinov has been reopened, which means that traffic on the motorway can continue as usual, except for a 60kph speed limit ona 2-kilometer section around exit 370.
The I/60 road has also been reopened in the morning. However, in two places before and at the beginning of Vápenná, traffic will have to continue on the hard shoulder until repairs on the main road have been completed.
Similar difficulties can be expected on the I/44 in the Česká Ves area and the I/46 in Opava, where the bridge is still closed and only accessible to pedestrians.
Oznacz jako wykorzystany
Latest Posts
Mont Blanc Tunnel maintenance: closures in February and March
Due to scheduled maintenance work, the Mont Blanc Tunnel, which connects Italy and France, will be completely closed on several dates in the second half of...
Germany: Traffic restrictions on the Norderelbe Bridge on the A1
As part of the expansion of the A1, work has begun on the new Norderelbe Bridge, which is to connect Hamburg-Wilhelmsburg with Rothenburgsort. Its...
Changes on the Paris ring road, A1 and A13 – a special lane and an HGV driving ban
Since March 3, a a special lane has been added to the Paris ring road and sections of the A1 and A13 motorways. The lane is designated for vehicles with at...